Home |KSEB |
Can I have my own battery pack for storing power from on grid solar system of model 2 under soura subsidy scheme?
Can I have my own battery pack for storing power from on grid solar system of model 2 under soura subsidy scheme?
Kerala State Electricity Board, Government of Kerala
Answered on March 08,2021
Answered on March 08,2021
Yes, you can use, inverter, UPS, etc.
Related Questions
-
Kerala State Electricity Board
Government of Kerala . Answered on January 20,2021What's the current status of KSEB soura. Has phase 1 completed? Upto what date phase 2 is complete (from date of registration) ?
Phase 1 in progress. Regarding Phase 2, installation to the shortlisted consumers will be completed by March 31.Shortlist is ...
1 0 338 -
Kerala State Electricity Board
Government of Kerala . Answered on January 25,2021When will the 2nd stage of soura panel installation start ?
Soura panel installation will start during February 2021 and installation will be completed to all consumers by April 2021
1 0 64 -
Kerala State Electricity Board
Government of Kerala . Answered on January 30,2021Since Soura Subsidy scheme will be closed once the count receive 75,000 applications, I have submitter the application today (29/01/2020) for Model 2 under soura 2.0 . Can I know the present count ?
Less than 20,000 only
1 0 0 -
Kerala State Electricity Board
Government of Kerala . Answered on February 16,2021I have submitted the application for Soura Subsidy scheme model 2 on 29/01/2021. Currently it is showing developer selection is closed as on 12/01/2021. When will be the next developer selection ? How it will be intimated ? Approx When can I expect the installation completion ?
When will be the next developer selection? March - April How it will be intimated? SMS, EMAIL, PRESS, SOCIAL MEDIA Approx ...
1 0 72 -
Kerala State Electricity Board
Government of Kerala . Answered on February 23,2021How to get to know the latest status of the Soura scheme as the proposed date of installation at my home was 20/02/2019 ?
Please contact KSEB Toll free Customer Care number 1912
1 0 37 -
Kerala State Electricity Board
Government of Kerala . Answered on March 01,2021I have submitted the application today (01/03/2021) for Model 2 under Soura Subsidy Project. The registration shows "Payment Initiated", whereas the online portal shows "Second Phase of Developer selection closed as on 12-01-2021". Can I know whether I am eligible for the subsidy?
"Second Phase of Developer selection closed as on 12-01-2021" this message has no connection with registration. The registration for ...
1 0 340 -
Kerala State Electricity Board
Government of Kerala . Answered on March 08,2021Since Soura Subsidy scheme will be closed once the count receive 75,000 applications, I have submitter the application today (07/03/2020) for Model 2 under soura 2.0 . Can I know the present count ?
Present count is around 20000 only.
1 0 66 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I have 3 phase connection for my house. So what will the installation charge for 1kw of model 2. Can I apply for a single-phase? 2. If I select single phase , whether it will affect the production because the phase connected with a low load in my home.
1 kW models are not available. Minimum requirement is 2kW. No need to convert to single phase. Please contact ...
1 0 907 -
Kerala State Electricity Board
Government of Kerala . Answered on April 21,2021What is the unit rate receiving now by the solar plant installing consumer for scheme 2 of KSEB Soura scheme by exporting energy to kseb grid ?
Rs.2.94/- per unit
1 0 224 -
Kerala State Electricity Board
Government of Kerala . Answered on May 24,2021I have applied for KSEB soura project last year (2020 somewhere between March and May). Necessary application fee also paid but no positive response from KSEB engineers. I have contacted concerned engineers but I receive only excuses such as shortlisting of developers/contractors, Assembly election, Election results, formation of new ministry and new policies and so on.Next excuse may be the monsoon. Now to whom and where shall I aproach to get a proper answer ?
Please call 1912.When you start hearing a welcome message, dial 19 to talk to executive.Tell them the consumer number ...
1 0 42 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021Can we expect the next phase of soura developer selection to open in June 2021?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 24 -
Citizen Helpdesk
Curated Answers from Government Sources . Answered on July 09,2021เดธเตเดตเดจเตเดคเด เดเดเดฏเดฟเตฝ เดเดฐเต เดเตเดฐเดฟเดชเตเดชเต เดจเดฟเตผเดฎเดพเดฃ เดฏเตเดจเดฟเดฑเตเดฑเต เดคเตเดเดเตเดเดฃเดฎเตเดจเตเดจเตเดฃเตเดเต. เด เดคเดฟเดจเต เดเดจเตเดคเตเดเตเดเต (เดชเดเตเดเดพเดฏเดคเตเดคเต , KSEB etc.) paper Work เดตเตเดฃเตเดเดฟเดตเดฐเตเด?
To know the approvals required for a specific project kindly fill up the questionnaire in the below link to ...
2 0 118