Home |Soura subsidy scheme |
I applied for soura phase 2. Since the scheme takes time.May I know. 1. Will they place panels on truss roofs 2. If its possible can I use any type of roofing material 3. What should be the inclination of the roof if it's to be made facing south ?
I applied for soura phase 2. Since the scheme takes time.May I know. 1. Will they place panels on truss roofs 2. If its possible can I use any type of roofing material 3. What should be the inclination of the roof if it's to be made facing south ?
Kerala State Electricity Board, Government of Kerala
Answered on March 19,2021
Answered on March 19,2021
1. Will they place panels on truss roofs? Yes, in Model 2. But consumer has to bear additional cost for installing Solar panels over the truss work (at 10 degree inclination towards south) and arrangement for doing periodic maintenance
2. If its possible can I use any type of roofing material 3. What should be the inclination of the roof if it's to be made facing south ? Panel has to be kept at 10 degree inclination towards south
KSFE
Sponsored
KSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1 83 1605 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1 89 1421 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเต เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเตฝ 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Will KSEB provides money to excess electricity in Model 2 of Soura scheme?
Yes, KSEB will provide money to excess electricity in Model 2 by the month of September every year.
1 13 201 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have applied for the KSEB Soura scheme Phase 1 earlier. Officers from KSEB inspected my rooftop.I have not got any reply from them since then. What to do?
Call 1912 with your consumer number and inform them about your issue.
1 22 386 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Is it possible for the customer to select the unit and company for solar panel installation in model 2 of the KSEB Soura scheme?
Customers can choose the company for solar panel installation in model 2 of the KSEB Soura scheme.
1 10 111 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดชเตเดฐเตเดฎเดฟเดฏเด เดเตเตพเดกเต เดฒเตเตบ
เดธเตเดตเตผเดฃเตเดฃเดตเดฟเดฒเดฏเตเดเต 85% เดตเดฐเต เดตเดพเดฏเตเดช...
-
Kerala State Electricity Board
Government of Kerala . Answered on March 17,2020I have applied for KSEB soura scheme. What are the next steps?
Survey and implementation of Soura Subsidy scheme will start immediately after completing regitration process. The installation of panels will ...
1 8 155 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Will there be any restrictions if we have to sell the house within 25 years after taking the KSEB Soura scheme?
There are no restrictions as such for the house owner.
1 4 67 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Can we install a solar power plant on the sloping roof as part of KSEB Soura scheme?
Yes, you can install it on a sloping roof as well.
1 11 190 -
KSFE
Sponsoredเดชเตเดฐเดตเดพเดธเดฟ เดฎเดฒเดฏเดพเดณเดฟเดเตพเดเตเดเดพเดฏเดฟ KSFE Duo
เดเดฟเดเตเดเดฟ + เดจเดฟเดเตเดทเตเดชเด = เดเดฐเดเตเดเดฟ เดจเตเดเตเดเด.
-
Kerala State Electricity Board
Government of Kerala . Answered on October 03,2020I have chosen model 1B with 3 kwp. As per my understanding, 1. 3*54,000= 1,62,000 is the scheme cost including all devices ( except inverter) 2. My contribution is 20% as per scheme that's 32,400/-. 3. I can use 60% of the power produced and 40 % will be returned to KSEB ?
Correct.
1 3 47 -
Kerala State Electricity Board
Government of Kerala .Are the rates mentioned in KSEB FB page for Soura scheme inclusive of GST or not ? If not, how much would be the GST?
Inclusive of GST
1 0 29 -
Kerala State Electricity Board
Government of Kerala . Answered on December 12,2020In KSEB Soura Subsidy Plan- Model 2. Will we have to pay the entire amount or the subsidized amount. If we need to pay the entire amount, what will be the process of claiming that subsidy amount ?
Consumer has to pay the subsidised amount only.
1 0 31 -
Kerala State Electricity Board
Government of Kerala . Answered on January 26,2021I have applied for KSEB soura phase 1, approved by KSEB and the feasibility study has been already completed by Tata Solar. Is it possible to change to Model no. 2 (paying entire amount after subsidy) for a 3 KW.?
Yes.Before installation you can change to model 2 of phase 1 Soura
1 19 360 -
Kerala State Electricity Board
Government of Kerala . Answered on December 22,2020On the developer selection tab of KSEB Soura Scheme, its showing that 1st phase of developer selection is closed as of 21st December 2020, so that I couldnt select the developer as of now. Will that slow down the installation process? When will be the 2nd phase of developer Selection opening ?
Next phase of developer selection will be announced on February.
1 0 368 -
Try to help us answer..
-
How can i cancel my registration roof top solar scheme under e kiran?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
How can i cancel my registration roof top solar scheme under e kiran?
-
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 87517 -
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 3127 65109 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023What is the procedure for tharam matom - land conversion nilam to purayidom in Kerala ?
Nilam - purayidom Land conversion or Tharam mattom in Kerala The register containing details of all types of land ( ...
1 76 7609 -
Niyas Maskan
Village Officer, Kerala . Answered on August 31,2023What is the format affidavit for non creamy layer certificate in Kerala?
เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเตผ เดฎเตเตปเดชเดพเดเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเตเดเดฟเตฝ เดเดจเตเดจ เดตเดพเตผเดกเดฟเตฝ เดเดจเตเดจ เดตเตเดเตเดเดฟเตฝ เดคเดพเดฎเดธเดฟเดเตเดเตเดจเตเดจ เดเดจเตเดจเดฏเดพเดณเตเดเต เดฎเดเตป เดเดฏ เดเดพเตป เดฌเตเดงเดฟเดชเตเดชเดฟเดเตเดเตเดจเตเดจ เดธเดคเตเดฏเดตเดพเดเตเดฎเตเดฒเด เดเดพเตป เดฎเตเตฝเดเดพเดฃเตเดจเตเดจ เด เดกเตเดฐเดธเดฟเตฝ เดเดคเตเดฐ ...
1 300 6115 -
Venu Mohan
Citizen Volunteer, Kerala . Answered on July 24,2021เดเตเดฐเดณเดคเตเดคเดฟเตฝ เดจเตเตบ เดเตเดฐเตเดฎเดฟ เดฒเดฏเตผ เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดฟเดเดพเดจเตเดณเตเดณ เดฎเดพเดจเดฆเดฃเตเดกเด เดเดจเตเดคเดพเดฃเต?
เดจเตเตบ เดเตเดฐเตเดฎเดฟเดฒเตเดฏเดฑเดฟเดจเต เดเตเดฑเดฟเดเตเดเตเดณเตเดณ เดชเตเตผเดฃ เดตเดฟเดตเดฐเดเตเดเตพ 2020เดฒเต เดฑเดตเดจเตเดฏเต เดเตเดกเดฟเตฝ เดจเดฟเดจเตเดจเต เดคเดพเดดเต เดเตเดเตเดคเตเดคเดฟเดเตเดเตเดฃเตเดเต. เด เดคเต เดจเตเดเตเดเดฟ เดฎเดจเดธเดฟเดฒเดพเดเดพเด เดคเดพเดเตเดเตพ เดเดคเดฟเดจเต เด เตผเดนเดจเดพเดฃเต เด เดฒเตเดฒเดฏเต เดเดจเตเดจเต. เดจเตเดฃเตเดเตเดฐเตเดฎเดฟเดฒเตเดฏเดฐเต ...
1 234 8000 -
Niyas Maskan
Village Officer, Kerala . Answered on January 26,2021How to get the affidavit for caste certificate in Kerala ?
เดเดฐเต เดตเตเดณเตเดณ เดชเตเดชเตเดชเดฑเดฟเตฝ เดฎเตเดเดณเดฟเตฝ เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจเต เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเตเด เด เดคเดฟเดจเต เดคเดพเดดเต เดเตผเดเตเดเดพเดฃเต เด เดคเต เดธเดฎเตผเดชเดฟเดเตเดจเดคเต เด เดคเต เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเตเด. เด เดคเดฟเดจเต เดถเตเดทเด เดเดฐเดพเดฃเต เดธเดฎเตผเดชเดฟเดเตเดจเดคเต เด เดตเดฐเตเดเต เดตเดฟเดตเดฐเด เดจเตฝเดเตเด. เด เดคเดฟเดจเต ...
1 476 21467 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 379 7553 -
Balachandran Kollam
Answered on September 05,2023เดเดพเดฃเด เดเดจเตเดฎเด เดเดเตเดเตเดจเตเดจเดคเดฟเดจเต เดเดจเตเดคเต เดเตเดฏเตเดฏเดฃเด?
เดเดจเตเดฎเดฟเดฏเดฟเตฝ เดจเดฟเดจเตเดจเตเด เดเดจเตเดฎเดเดคเตเดฐเต เดเดดเตเดคเดฟ เดตเดพเดเตเดเตเดเดฏเต เด เดคเดฟเดจเต เดธเดพเดงเตเดฏเดฎเดฒเตเดฒเตเดเตเดเดฟเตฝ เดฒเดพเตปเดกเต เดเตเดฐเดฟเดฌเตเดฏเตเดฃเดฒเดฟเตฝ เดชเดพเดเตเดเดพเดฏเดคเดฟเดจเดพเดฏเดฟ เด เดชเตเดเตเดทเดฟเดเตเดเตเดเดฏเต เดเตเดฏเตเดฏเตเด. เดเดจเตเดคเต เดคเดฐเด เดเดพเดฃเดพเดฎเดพเดฃเตเดจเตเดจเต เดตเตเดฏเดเตเดคเดฎเดฒเตเดฒ. เดเตเดฐเดฟเดฌเตเดฏเตเดฃเดฒเดฟเดจเต เดชเดฐเดฟเดเดฃเดฟเดเตเดเดพเดจเดพเดเดพเดคเตเดค เดเดฟเดฒเดฏเดฟเดจเด ...
1 0 584 -
KSFE
Government of Kerala . Answered on July 21,2023What is suspense amount in KSFE Chitty?
เดเดคเตเดเตเดเดฟเดฒเตเด เดคเดตเดฃ เดเดฟเดเตเดเดฟเดฏเดฟเตฝ installment เดคเตเดเดฏเตเดเตเดเดพเตพ เด เดงเดฟเดเดฎเดพเดฏเต เดเตเดฑเดเตเดเต เด เดเดเตเดเดฟเดเตเดเตเดฃเตเดเตเดเตเดเดฟเตฝ เด เดคเตเด Suspense Credit/Debit เดเดฏเดฟ เดจเดฟเดฒเดจเดฟเตผเดคเตเดคเตเด. เด เดเตเดคเตเดค เดคเดตเดฃ เดคเตเด เด เดเดฏเตเดเตเดเตเดฎเตเดชเตเตพ เดเดฏเดคเต ...
1 0 2496 -
Kerala State Electricity Board
Government of Kerala . Answered on May 26,2020เดฎเดพเตผเดเตเด เดคเดเดธเตเดธเด เดจเดฟเดฒเตเดเตเดเตเดจเตเดจ เดเดฒเดเตเดเตเดฐเดฟเดเต เดชเตเดธเตเดฑเตเดฑเต เดจเตเดเตเดเด เดเตเดฏเตเดฏเตเดจเตเดจเดคเดฟเดจเต เดเดจเตเดคเต เดเตเดฏเตเดฏเดฃเด?
เด เดเตเดคเตเดคเตเดณเตเดณ เดเดฒเดเตเดเตเดฐเดฟเดธเดฟเดฑเตเดฑเดฟ เดธเตเดเตเดทเตป เดเดซเตเดธเดฟเตฝ เด เดชเตเดเตเดท เดเตเดเตเดคเตเดคเต เดชเตเดธเตเดฑเตเดฑเต เดจเตเดเตเดเดฟเดฏเดฟเดเดพเดจเตเดณเตเดณ เดตเตผเดเตเดเต เดกเตเดชเตเดชเตเดธเดฟเดฑเตเดฑเต เดคเตเด เด เดเดฏเตเดเตเดเดฃเด.
1 0 2234