Home |Soura subsidy scheme |
I have applied for 3kw under Model II. As per the list of cost available on the website the total cost is shown as Rs75596/-. Below the table Model II, there is another table showing the cost per kw . In that table, the cost per kw for 3 kw plant is Rs.41998/-. after deduction of 40% the cost will be Rs.94500/- Why this difference? Any mistake? If so please make the required correction in the list of cost.
I have applied for 3kw under Model II. As per the list of cost available on the website the total cost is shown as Rs75596/-. Below the table Model II, there is another table showing the cost per kw . In that table, the cost per kw for 3 kw plant is Rs.41998/-. after deduction of 40% the cost will be Rs.94500/- Why this difference? Any mistake? If so please make the required correction in the list of cost.
Kerala State Electricity Board, Government of Kerala
Answered on December 28,2020
Answered on December 28,2020
For 3kW in model 2, consumer has to pay Rs75596/-. No other charges
KSFE
Sponsored
KSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020If my house needs to be renovated, will KSEB replace the Soura solar panel free of cost?
You have to pay the labour charge for replacing the Soura solar panel.
1 13 200 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1 83 1605 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเต เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเตฝ 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1 89 1421 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020How much will be the cost for 2 kWp installation for KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 30 600 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have 1000 sqft rooftop. How many kw of solar panel can I install as part of KSEB Soura scheme?
1 kw requires 100 sqft. So you can install 10kw of solar panel on 1000 sqft rooftop. With 10 ...
1 65 1252 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดชเตเดฐเตเดฎเดฟเดฏเด เดเตเตพเดกเต เดฒเตเตบ
เดธเตเดตเตผเดฃเตเดฃเดตเดฟเดฒเดฏเตเดเต 85% เดตเดฐเต เดตเดพเดฏเตเดช...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020For 3KW plant, how much is the cost in KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 40 759 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have applied for the KSEB Soura scheme Phase 1 earlier. Officers from KSEB inspected my rooftop.I have not got any reply from them since then. What to do?
Call 1912 with your consumer number and inform them about your issue.
1 22 386 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Is it possible for the customer to select the unit and company for solar panel installation in model 2 of the KSEB Soura scheme?
Customers can choose the company for solar panel installation in model 2 of the KSEB Soura scheme.
1 10 111 -
KSFE
Sponsoredเดชเตเดฐเดตเดพเดธเดฟ เดฎเดฒเดฏเดพเดณเดฟเดเตพเดเตเดเดพเดฏเดฟ KSFE Duo
เดเดฟเดเตเดเดฟ + เดจเดฟเดเตเดทเตเดชเด = เดเดฐเดเตเดเดฟ เดจเตเดเตเดเด.
-
Kerala State Electricity Board
Government of Kerala . Answered on March 17,2020I have applied for KSEB soura scheme. What are the next steps?
Survey and implementation of Soura Subsidy scheme will start immediately after completing regitration process. The installation of panels will ...
1 8 155 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Can we install a solar power plant on the sloping roof as part of KSEB Soura scheme?
Yes, you can install it on a sloping roof as well.
1 11 190 -
KSFE
SponsoredKSFE เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024
เดเดจเตเดฎเดฆเดฟเดจเดพเดเตเดทเดเตเดเดณเตเดเต เดญเดพเดเดฎเดพเดฏเดฟ เดเต.เดเดธเต.เดเดซเต.เด.เดฏเตเดเต เดเดฒเตเดฒเดพ เดถเดพเดเดเดณเดฟเดฒเตเด เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024 เดจเดเดคเตเดคเตเดจเตเดจเดคเดพเดฃเต
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020How much area wanted for 3 kW solar plant as part of the KSEB Soura scheme?
300 sqft is required for a 3 kW Solar plant.
1 5 54 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Is it true that once the KSEB soura plant was installed, the homeowner would not be allowed to do anything (like painting) for 25 years?
There are no restrictions as such for the house owner.
1 7 84 -
KSFE
SponsoredKSFE เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024
เดเดจเตเดฎเดฆเดฟเดจเดพเดเตเดทเดเตเดเดณเตเดเต เดญเดพเดเดฎเดพเดฏเดฟ เดเต.เดเดธเต.เดเดซเต.เด.เดฏเตเดเต เดเดฒเตเดฒเดพ เดถเดพเดเดเดณเดฟเดฒเตเด เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024 เดจเดเดคเตเดคเตเดจเตเดจเดคเดพเดฃเต
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Is it possible to install 8 kW plant as part of Model 1 of the KSEB Soura scheme?
No. Please refer Model II of KSEB soura plant scheme
1 4 39 -
Try to help us answer..
-
How can i cancel my registration roof top solar scheme under e kiran?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
How can i cancel my registration roof top solar scheme under e kiran?
-
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 88451 -
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 3149 65558 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 5997 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 392 7810 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on November 03,2021เดเดจเตเดคเดพเดฃเต เดคเดฃเตเดเดชเตเดชเตเดฐเต เดฌเตเดเตเดเต เด เดฅเดตเดพ เดคเดฃเตเดเดชเตเดชเตเดฐเต เดเดฃเดเตเดเต เด เดฅเดตเดพ เดคเดฃเตเดเดชเตเดชเตเดฐเต เด เดเตเดเตเดฃเตเดเต เด เดฅเดตเดพ เดคเดฃเตเดเดชเตเดชเตเดฐเต เดจเดฎเตเดชเตผ?
เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเตเดเดณเดฟเตฝ, เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเตฝ , เดจเดฟเดเตเดคเดฟ เด เดเดฏเตเดเตเดเตเดจเตเดจ เดญเต เดเดเดฎเดเดณเตเดเต เดชเตเดฐเตเด เดฎเตเตฝเดตเดฟเดฒเดพเดธเดตเตเด เดตเดธเตเดคเตเดตเดฟเตปเดฑเต เดธเตผเดตเต เดจเดฎเตเดชเดฑเตเด, เดตเดธเตเดคเตเดตเดฟเตปเดฑเต เดเดจเดตเตเด เดตเดธเตเดคเตเดตเดฟเดจเตเดฑเต เด เดณเดตเตเด เดฐเตเดเดชเตเดชเตเดเตเดคเตเดคเดฟ ...
1 0 6838 -
Niyas Maskan
Village Officer, Kerala . Answered on March 10,2022เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเต เดธเดฎเดฏเด เดเดคเตเดฐเดตเดฐเต ? เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดดเตเดคเดพเตป เดชเตเดฐเดคเตเดฏเตเดเด เดธเดฎเดฏเด เดเดฃเตเดเต ?
เดฐเดพเดตเดฟเดฒเต 10 เดฎเดฃเดฟ เดฎเตเดคเตฝ เดตเตเดเตเดจเตเดจเตเดฐเด 5 เดฎเดฃเดฟเดตเดฐเต, เดเดเตเดเดฏเตเดเตเดเต Lunch time
1 0 2243 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on July 07,2020เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด / เดจเดฟเดเตเดคเดฟ เดเตบเดฒเตเดจเดพเดฏเดฟ เดเดเตเดเดจเต เด เดเดฏเตเดเตเดเดพเด?
เดเตเดฐเดณเดคเตเดคเดฟเตฝ เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด เดเตบเดฒเตเดจเดพเดฏเดฟ เด เดเดฏเตเดเตเดเตเดจเตเดจเดคเดฟเดจเต, เดคเดฃเตเดเดชเตเดชเตผ เดเดตเดถเตเดฏเดฎเดพเดฃเต. เดเดฎเตเดชเตเดฏเตเดเตเดเตผ เดเดจเดฑเตเดฑเตเดฑเตเดเตเดฏเตเดค เดจเดฎเตเดชเดฑเดพเดฃเต เดคเดฃเตเดเดชเตเดชเตผ. เดคเดฃเตเดเดชเตเดชเตผ เดฒเดญเดฟเดเตเดเดพเตป, เดเดจเดฟเดชเตเดชเดฑเดฏเตเดจเตเดจ เดฐเตเดเดเดณเตเดฎเดพเดฏเดฟ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเต เดธเดจเตเดฆเตผเดถเดฟเดเตเดเตเด. เดญเตเดฎเดฟเดฏเตเดฎเดพเดฏเดฟ เดฌเดจเตเดงเดชเตเดชเตเดเตเด เดฐเตเดเดเตพ เดเดดเดฟเดเตเด เดตเตผเดทเดคเตเดคเต ...
1 0 22440 -
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on June 25,2021NPS,NPNS, NPI, PHH,AAY เดเดจเตเดคเดพเดฃเต?
NPS - Non Priority Subsidy,NPNS - Non Priority Non Subsidy,NPI - Non Priority Institution,PHH - Priority House Hold,AAY - ...
2 0 19036 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on November 07,2023เดเดฐเดฎเดเดเตเด เดฐเดธเตเดคเต เดจเดทเตเดเดฎเดพเดฏเดพเตฝ เดเดจเตเดคเต เดเตเดฏเตเดฏเดพเด?
เดเดฑเตเดฑเดตเตเด เดชเตเดคเดฟเดฏ เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดฃเต เดจเดทเตเดเดชเตเดชเตเดเตเดเดคเตเดเตเดเดฟเตฝ เดกเตเดฏเตเดชเตเดฒเดฟเดเตเดเตเดฑเตเดฑเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเตฝ เดจเดฟเดจเตเดจเตเด เดตเดพเดเตเดเดพเด.
1 0 254 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on November 03,2021เดเดจเตเดคเดพเดฃเต เดญเตเดฎเดฟเดฏเตเดเต เดธเตผเดตเต เดจเดฎเตเดชเตผ? เดเดจเตเดคเดพเดฃเต เดญเตเดฎเดฟเดฏเตเดเต เดฑเตเดธเตผเดตเต เดจเดฎเตเดชเตผ?
เดธเตผเดตเต เดจเดฎเตเดชเตผ เดเดจเตเดคเดพเดฃเตเดจเตเดจเต เดชเดฑเดฏเดพเตป เดธเดพเดงเดฟเดเตเดเดพเดคเต เดเดฐเต เดฑเดตเดจเตเดฏเต เดเตเดตเดจเดเตเดเดพเดฐเดจเดพเดฏเดฟ เดถเดฎเตเดชเดณเด เดตเดพเดเตเดเดฟเดเตเดเตเดจเตเดจเดคเดฟเดฒเตเด เดตเดฒเดฟเดฏ เดเดฐเต เดจเดพเดฃเดเตเดเตเดเดฟเดฒเตเดฒ. เดเดพเดฐเดฃเด เดธเตผเดเตเดเดพเตผ เดเดฟเดฒเดตเดฟเตฝ เดถเดฎเตเดชเดณเดคเตเดคเตเดเต เดธเตผเดตเต เดชเด เดฟเดเตเดเดตเดฐเดฒเตเดฒเต ...
1 121 5044