Home |KSEB |I have Phase 1 Model 1 Soura Solar Panels installed at my home where KSEB pays for 10% of the electricity generated without any investment fromy end. Can i convert it to Phase 2 Model 2 of the new Soura Scheme by paying 75000 which the cost of 3K Model 2 Plant ?
I have Phase 1 Model 1 Soura Solar Panels installed at my home where KSEB pays for 10% of the electricity generated without any investment fromy end. Can i convert it to Phase 2 Model 2 of the new Soura Scheme by paying 75000 which the cost of 3K Model 2 Plant ?
Kerala State Electricity Board, Government of Kerala
Answered on October 04,2021
Answered on October 04,2021
You may please visit ekiran.kseb.in for more details
Related Questions
-
Kerala State Electricity Board
Government of Kerala . Answered on April 07,2021I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
1. Existing meter will be replaced with Net meter2. Fixed charge is based on net import. Tariff fixed by ...
2 0 650 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021What about terms and conditions for a hybrid inverter for KSEB soura type 3 model? As it works as on-grid and provides backup, any subsidy is available for same?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 633 -
Kerala State Electricity Board
Government of Kerala . Answered on January 19,2021As I have selected the developer for Soura Subsidy Scheme in December, what is the next step of installation and when and how the same shall be initiated? KSEB or the developer will contact me ?
Please confirm whether you are shortlisted by calling 1912. If you are shortlisted, there will be site inspection during ...
1 0 421 -
Kerala State Electricity Board
Government of Kerala . Answered on January 19,2021Is developer selection Phase 2 soura scheme over as shown in KSEB site. When can we apply for next phase ?
Next phase will be during March- April 2021.
1 0 224 -
Kerala State Electricity Board
Government of Kerala . Answered on January 20,2021I registered for kseb soura phase 2 on Jan 6th. And the site is now showing developer selection is over for phase 2 but we didn't get any option for developer selection. What should we do ?
Developer selection completed recently. Next phase during March-April 2021.
1 0 110 -
Kerala State Electricity Board
Government of Kerala .Can I get recent KSEB bill details along with my address online?
You can check it in 2 ways Please login to wss.kseb.in or download mobile app "KSEB" from play store and ...
1 0 497 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I have registered under kseb soura model 2 on 26th jan 2021. When can I expect the developer selection to be opened for next phase ?
May 2021
1 0 83 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I would like to go for KSEB's Saura scheme Model II. My average monthly consumption is 250-275 units. 1) What capacity plant I should select? 2) Is the scheme with 40% subsidy still available? 3) What is the expected maintenance cost of plant, say 4kwp capacity plant, from 6th year onwards?
1) What capacity plant I should select? Model 2, 3kW 2) Is the scheme with 40% subsidy still available? Yes 3) ...
1 0 315 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021Applied for the KSEB soura scheme in January. Nothing happened till now, no developer selection, site inspection etc. Will something happen in the near future?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 105 -
Kerala State Electricity Board
Government of Kerala . Answered on August 11,2021I applied for KSEB Soura project 4 kv Model 2. Can solar panels be installed on top of roof tiles or not? Can I change from Model II 4kv to Model I 2 kv?
Yes. you might have to bear the cost of framework for the installation.You may please contact Soura team for ...
1 0 185 -
Kerala State Electricity Board
Government of Kerala . Answered on January 30,2021I have applied Soura phase 1 model 1 and field survey has been completed by Tata solar. Is it possible to change to Model 3 ,ie, paying entire cost for a 3 kw solar system?
Yes..
1 6 86 -
Kerala State Electricity Board
Government of Kerala . Answered on February 23,2021I have applied for Soura Subsidy project - MODEL II by paying application fee of 1000/- on Feb 21-2021. My application status is showing 'processed'. By when can I expect site inspection, project completion?
Site inspection will be conducted only after next round of Developer selection during April
1 0 168 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I have registered for Soura Subsidy Project Model 2 by paying the application fee in the month of Dec 2020. I have selected the developer also. Unfortunately, nobody has responded yet. What should I do ?
Sir, you are not shortlisted for this phase. Please wait for next phase of developer selection, which is expected ...
1 0 92