If I have an offgrid solar power plant installed in my home, can i apply for the kseb's sourya subsidy on-grid scheme?
If I have an offgrid solar power plant installed in my home, can i apply for the kseb's sourya subsidy on-grid scheme?
Kerala State Electricity Board, Government of Kerala
Answered on November 08,2021
Answered on November 08,2021
Related Questions
-
Kerala State Electricity Board
Government of Kerala . Answered on January 19,2021Is developer selection Phase 2 soura scheme over as shown in KSEB site. When can we apply for next phase ?
Next phase will be during March- April 2021.
1 0 224 -
Kerala State Electricity Board
Government of Kerala . Answered on January 30,2021I have applied Soura phase 1 model 1 and field survey has been completed by Tata solar. Is it possible to change to Model 3 ,ie, paying entire cost for a 3 kw solar system?
Yes..
1 6 86 -
Kerala State Electricity Board
Government of Kerala . Answered on March 19,2021I would like to go for KSEB's Saura scheme Model II. My average monthly consumption is 250-275 units. 1) What capacity plant I should select? 2) Is the scheme with 40% subsidy still available? 3) What is the expected maintenance cost of plant, say 4kwp capacity plant, from 6th year onwards?
1) What capacity plant I should select? Model 2, 3kW 2) Is the scheme with 40% subsidy still available? Yes 3) ...
1 0 315 -
Kerala State Electricity Board
Government of Kerala . Answered on April 07,2021I have registered for KSEB's Soura scheme Model II, I have paid for the existing meter, 1) will it be replaced by net-meter - how much have to pay if not renting 2) how is fixed charge calculated for soura consumers (e.g if consumption is less than export) 3)is there facility in inverter that can alert kseb office in cases of low energy production
1. Existing meter will be replaced with Net meter2. Fixed charge is based on net import. Tariff fixed by ...
2 0 650 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021What about terms and conditions for a hybrid inverter for KSEB soura type 3 model? As it works as on-grid and provides backup, any subsidy is available for same?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 633 -
Kerala State Electricity Board
Government of Kerala . Answered on July 07,2021Applied for the KSEB soura scheme in January. Nothing happened till now, no developer selection, site inspection etc. Will something happen in the near future?
เดเต เดเดธเต เด เดฌเดฟเดฏเตเดเต เดชเตเดฐเดชเตเดชเตเดฑ เดธเตเดฐเตเตผเดเตเด เดชเดฆเตเดงเดคเดฟเดฏเดพเดฏ 'เดธเตเดฐ' เดธเดเดฌเดจเตเดงเดฟเดเตเด เดตเดฟเดตเดฐเดเตเดเตพ เดเดฐเดพเดฏเดพเดจเตเด เดธเดเดถเดฏเดเตเดเตพ เดฆเตเดฐเตเดเดฐเดฟเดเตเดเดพเดจเตเด เดชเตเดฐเดตเตเดคเตเดคเดฟ เดฆเดฟเดตเดธเดเตเดเดณเดฟเตฝ เดฐเดพเดตเดฟเดฒเต 10 เดจเตเด เดตเตเดเตเดเตเดเต ...
1 0 105 -
Kerala State Electricity Board
Government of Kerala . Answered on July 28,2021I have registered under the KSEB soura scheme II. How do I know whether I have been selected. I had also paid the registration charges. That has been now adjusted in my monthly power bill. There is no communication regarding the solar registration so far.
https://ekiran.kseb.in/ เดเดจเตเดจ เดตเตเดฌเตเดธเตเดฑเตเดฑเต เดตเดดเดฟเดฏเต 9496018370, 9496266631 เดเดจเตเดจเต เดจเดฎเตเดชเดฐเตเดเดณเดฟเดฒเต เด เดจเตเดตเตเดทเดฟเดเตเดเดฑเดฟเดฏเดพเตป เดเดดเดฟเดฏเตเด
1 0 2863 -
Kerala State Electricity Board
Government of Kerala . Answered on October 04,2021I have Phase 1 Model 1 Soura Solar Panels installed at my home where KSEB pays for 10% of the electricity generated without any investment fromy end. Can i convert it to Phase 2 Model 2 of the new Soura Scheme by paying 75000 which the cost of 3K Model 2 Plant ?
You may please visit ekiran.kseb.in for more details
1 0 94 -
Kerala State Electricity Board
Government of Kerala . Answered on August 11,2021I applied for KSEB Soura project 4 kv Model 2. Can solar panels be installed on top of roof tiles or not? Can I change from Model II 4kv to Model I 2 kv?
Yes. you might have to bear the cost of framework for the installation.You may please contact Soura team for ...
1 0 185 -
Kerala State Electricity Board
Government of Kerala . Answered on October 04,2021How to change my KSBE Soura scheme service provider?
You may please visit ekiran.kseb.in for more details
1 0 348 -
Kerala State Electricity Board
Government of Kerala . Answered on October 04,2021I have space to put up about 65kWp of solar panel. How much subsidy is allowed by KSEB?
You may please visit ekiran.kseb.in for more details
1 0 34 -
Kerala State Electricity Board
Government of Kerala . Answered on October 12,2021Under Soura Subsidy scheme, Is it possible to install Mono perc panels, if I am ready to meet the additional expenses for for the same?. My aim is to generate more electricity from the limited space available.
เดธเตเดฐ เดชเตเดฐเตเดเดเตเดเดฟเดจเตเดฑเต เดญเดพเดเดฎเดพเดฏเดฟ เดฎเตเดฃเต เดชเตเตผเดเต เดเดจเตเดจเต เดชเตเดณเดฟ เดเตเดฐเดฟเดธเตเดฑเตเดฑเดฒเตเตป เดเดจเตเดจเต เด เดฒเตเดฒเตเดเตเดเดฟเตฝ เดฎเตเดฃเต เดเตเดฐเดฟเดธเตเดฑเตเดฑเดฒเตเตป เดเดจเตเดจเต เดชเดฑเดฏเตเดจเตเดจ เดฐเตเดคเดฟเดฏเดฟเตฝ เดเดณเตเดณ เดธเตเดชเตเดธเดฟเดซเดฟเดเตเดเตเดทเตป KSEB เดเตเดเตเดคเตเดคเดฟเดเตเดเดฟเดฒเตเดฒ ...
1 0 299 -
Kerala State Electricity Board
Government of Kerala . Answered on October 28,2021Can I use excess energy produced by my roof top solar in another house in my own name?
Yes
1 0 262