Home |Soura subsidy scheme |
In the KSEB Soura scheme, does the electricity generated is taken to the grid or do we need to have battery to store the power?
In the KSEB Soura scheme, does the electricity generated is taken to the grid or do we need to have battery to store the power?
Nandakumar N, Assistant Engineer, Soura Project, KSEB
Answered on March 05,2020
Answered on March 05,2020
In Off-Grid, you have the need for a battery. But KSEB's projects are On-Grid and in it, there is no need for a battery. The excess energy will be transfer to the grid.
KSFE
Sponsored
KSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What is the minimum space required to install a solar rooftop project as part of the KSEB Soura scheme?
For installing a minimum solar plant capacity of 2 kWp, 200 sq.ft. is required.
1 38 714 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can the solar panel be installed in the house where the tress work is done as part of the KSEB Soura scheme?
It can be done in Model 2,at the customer's expense,with 40% subsidy. Model II of KSEB SOURA Subsidy scheme Consumer owns ...
1 57 1088 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเต เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเตฝ 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1 83 1609 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1 89 1423 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Is the amount paid for the KSEB Soura scheme refundable?
The amount paid for KSEB Soura scheme is refundable, provided that KSEB find it technically not feasible to set up ...
1 40 758 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดชเตเดฐเตเดฎเดฟเดฏเด เดเตเตพเดกเต เดฒเตเตบ
เดธเตเดตเตผเดฃเตเดฃเดตเดฟเดฒเดฏเตเดเต 85% เดตเดฐเต เดตเดพเดฏเตเดช...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Who will do the maintenance for the KSEB Soura scheme?
KSEB will do the maintenance through an empanelled service provider. KSEB will provide a list of empanelled service providers. ...
1 19 369 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Should I apply for Model 1 or 2 of KSEB Soura Scheme?
You can register for any of the models now. After inspection, based on technical feasibility, you have the option ...
1 23 440 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020How much will be the cost for 2 kWp installation for KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 30 600 -
KSFE
Sponsoredเดชเตเดฐเดตเดพเดธเดฟ เดฎเดฒเดฏเดพเดณเดฟเดเตพเดเตเดเดพเดฏเดฟ KSFE Duo
เดเดฟเดเตเดเดฟ + เดจเดฟเดเตเดทเตเดชเด = เดเดฐเดเตเดเดฟ เดจเตเดเตเดเด.
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have 1000 sqft rooftop. How many kw of solar panel can I install as part of KSEB Soura scheme?
1 kw requires 100 sqft. So you can install 10kw of solar panel on 1000 sqft rooftop. With 10 ...
1 65 1252 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Will KSEB provides money to excess electricity in Model 2 of Soura scheme?
Yes, KSEB will provide money to excess electricity in Model 2 by the month of September every year.
1 13 202 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020For 3KW plant, how much is the cost in KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 40 759 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can I apply for KSEB Soura Scheme when the construction of my house is going on?
If you are planning to finish construction in 6 months' time, you can apply for it. If it is ...
1 9 134 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can I change the model, even if I have registered for KSEB Soura Scheme?
You can change the model. While inspection, if it is technically not feasible to be done by one model, ...
1 8 100 -
Try to help us answer..
-
How can i cancel my registration roof top solar scheme under e kiran?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
How can i cancel my registration roof top solar scheme under e kiran?
-
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 89795 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 6601 -
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 3183 66231 -
Niyas Maskan
Village Officer, Kerala . Answered on March 10,2022เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเต เดธเดฎเดฏเด เดเดคเตเดฐเดตเดฐเต ? เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดดเตเดคเดพเตป เดชเตเดฐเดคเตเดฏเตเดเด เดธเดฎเดฏเด เดเดฃเตเดเต ?
เดฐเดพเดตเดฟเดฒเต 10 เดฎเดฃเดฟ เดฎเตเดคเตฝ เดตเตเดเตเดจเตเดจเตเดฐเด 5 เดฎเดฃเดฟเดตเดฐเต, เดเดเตเดเดฏเตเดเตเดเต Lunch time
1 0 2351 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 413 8235 -
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on August 12,2020เดเดจเตเดคเดพเดฃเต เดเดดเดฟเดฎเตเดฑเดฟ?
เดตเดธเตเดคเต เดชเดฃเดฏเดชเตเดชเตเดเตเดคเตเดคเดฟ เดฌเดพเดเตเดเตเดเดณเดฟเตฝ เดจเดฟเดจเตเดจเตเด เดฒเตเตบ เดเดเตเดเตเดเตเดฎเตเดชเตเตพ เดฐเดฃเตเดเตเดคเดฐเดคเตเดคเดฟเดฒเตเดณเตเดณ เดชเดฃเดฏเดชเตเดชเตเดเตเดคเตเดคเดฒเดพเดฃเต เดเดฃเตเดเดพเดตเดพเดฑเตเดณเตเดณเดคเต. 1) Equitable Mortgage 2) Registered Mortgage Nationalized Shedule เดฌเดพเดเตเดเตเดเตพ เดธเดพเดงเดพเดฐเดฃเดฏเดพเดฏเดฟ Equitable Mortgage เดเดฃเต ...
2 0 6702 -
KSFE
Government of Kerala . Answered on August 11,2022Can I transfer ksfe chitty from one customer to another?
เดจเดฟเดฌเดจเตเดงเดจเดเตพเดเตเดเดจเตเดธเดฐเดฟเดเตเดเต เดตเดฟเดณเดฟเดเตเดเตเดเตเดเตเดเดพเดคเตเดค เดเดฟเดเตเดเดฟเดเตพ เดเตเดฐเดพเตปเดธเตเดซเตผ เดเตเดฏเตเดฏเดพเดตเตเดจเตเดจเดคเดพเดฃเต.
1 0 1152 -
KSFE
Government of Kerala . Answered on July 21,2023What is suspense amount in KSFE Chitty?
เดเดคเตเดเตเดเดฟเดฒเตเด เดคเดตเดฃ เดเดฟเดเตเดเดฟเดฏเดฟเตฝ installment เดคเตเดเดฏเตเดเตเดเดพเตพ เด เดงเดฟเดเดฎเดพเดฏเต เดเตเดฑเดเตเดเต เด เดเดเตเดเดฟเดเตเดเตเดฃเตเดเตเดเตเดเดฟเตฝ เด เดคเตเด Suspense Credit/Debit เดเดฏเดฟ เดจเดฟเดฒเดจเดฟเตผเดคเตเดคเตเด. เด เดเตเดคเตเดค เดคเดตเดฃ เดคเตเด เด เดเดฏเตเดเตเดเตเดฎเตเดชเตเตพ เดเดฏเดคเต ...
1 0 2737 -
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on June 25,2021NPS,NPNS, NPI, PHH,AAY เดเดจเตเดคเดพเดฃเต?
NPS - Non Priority Subsidy,NPNS - Non Priority Non Subsidy,NPI - Non Priority Institution,PHH - Priority House Hold,AAY - ...
2 0 19326 -
Citizen Helpdesk
Curated Answers from Government Sources . Answered on November 27,2021Which hospitals in Kerala accept Medisep Insurance?
Hospital empanelment is not yet completed Source: This answer is provided by Finance (Health Insurance) Department, Kerala
2 476 36023