Home |Soura subsidy scheme |
Is it true that once the KSEB soura plant was installed, the homeowner would not be allowed to do anything (like painting) for 25 years?
Is it true that once the KSEB soura plant was installed, the homeowner would not be allowed to do anything (like painting) for 25 years?
Nandakumar N, Assistant Engineer, Soura Project, KSEB
Answered on March 22,2020
Answered on March 22,2020
There are no restrictions as such for the house owner.
KSFE
Sponsored
KSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, ...
1 83 1605 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1 89 1421 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเต เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเตฝ 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Is it possible for the customer to select the unit and company for solar panel installation in model 2 of the KSEB Soura scheme?
Customers can choose the company for solar panel installation in model 2 of the KSEB Soura scheme.
1 10 111 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Can homes with asbestos apply for model 2 of KSEB soura scheme?
You can apply for it, but you will need to create the structure to support solar panels.
1 8 61 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Will there be any restrictions if we have to sell the house within 25 years after taking the KSEB Soura scheme?
There are no restrictions as such for the house owner.
1 4 67 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดชเตเดฐเตเดฎเดฟเดฏเด เดเตเตพเดกเต เดฒเตเตบ
เดธเตเดตเตผเดฃเตเดฃเดตเดฟเดฒเดฏเตเดเต 85% เดตเดฐเต เดตเดพเดฏเตเดช...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Can't remember the KSEB Soura model I have applied for? Is there any way to find it?
There is a flexibility to change the plan before signing the agreement for KSEB Soura scheme.
1 5 44 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Is it possible to install 8 kW plant as part of Model 1 of the KSEB Soura scheme?
No. Please refer Model II of KSEB soura plant scheme
1 4 39 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020We have already installed a solar power plant of 2 KW with the assistance of Anert. Are we eligible for the KSEB Soura scheme?
You are not eligible for the KSEB Soura Scheme
1 6 98 -
KSFE
Sponsoredเดชเตเดฐเดตเดพเดธเดฟ เดฎเดฒเดฏเดพเดณเดฟเดเตพเดเตเดเดพเดฏเดฟ KSFE Duo
เดเดฟเดเตเดเดฟ + เดจเดฟเดเตเดทเตเดชเด = เดเดฐเดเตเดเดฟ เดจเตเดเตเดเด.
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 22,2020Is it possible to install 4 kW plant as part of Model 1C of the KSEB Soura scheme?
No. You can install only 2 kW or 3 kW plant as part of Model 1C of the KSEB ...
1 6 47 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on June 05,2020Regarding KSEB soura scheme, Can we use battery to save solar energy and use it while there is no electricity from kseb?
เดฌเดพเดฑเตเดฑเดฑเดฟ เดธเตเดฑเตเดฑเตเดฑเตเดเต เดธเตเดฐ เดชเดฆเตเดงเดคเดฟเดฏเดฟเตฝ เดเตพเดชเตเดชเตเดเตเดเดฟเดเตเดเดฟเดฒเตเดฒ. เดเดจเตเดจเดพเตฝ เดฒเตเดกเดฟเตปเตเดฑเต เดญเดพเดเดฎเดพเดฏเดฟ เดฌเดพเดฑเตเดฑเดฑเดฟ เดธเตเดฑเตเดฑเตเดฑเตเดเต เดเตปเดตเตผเดเตเดเดฑเตเดเตพ เดเดชเดญเตเดเตเดคเดพเดตเดฟเดจเต เดธเตเดตเดจเตเดคเด เดจเดฟเดฒเดฏเดฟเตฝ เดตเดฏเตเดเตเดเดพเดตเตเดจเตเดจเดคเดพเดฃเต.
2 10 609 -
Kerala State Electricity Board
Government of Kerala . Answered on June 09,2020Regarding KSEB soura scheme, Can we use battery to save solar energy and use it while there is no electricity from kseb?
Inverter can be used.Not solar inverter
2 8 570 -
Kerala State Electricity Board
Government of Kerala . Answered on June 22,2020It is seen that consumers having monthly average consumption above 200 units are not eligible for the Saura Subsidy scheme. Is it correct? Is there any stipulation like that?
Consumers having monthly average consumption above 200 units can register in Model 2.
2 0 49 -
Kerala State Electricity Board
Government of Kerala . Answered on July 28,2020Who will have ownership of solar panels in both Soura models? I mean, solar panel property ownership. In case of house ownership get changed (due to sale or partitions etc), Is there permission required from KSEB?
Model 2: Consumer has full ownership. He/she can sell the property, with or without solar panels Model 1: The conditions ...
2 0 112 -
Try to help us answer..
-
How can i cancel my registration roof top solar scheme under e kiran?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
How can i cancel my registration roof top solar scheme under e kiran?
-
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 87403 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023What is the procedure for tharam matom - land conversion nilam to purayidom in Kerala ?
Nilam - purayidom Land conversion or Tharam mattom in Kerala The register containing details of all types of land ( ...
1 74 7578 -
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 3124 65053 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 378 7534 -
Niyas Maskan
Village Officer, Kerala . Answered on August 31,2023What is the format affidavit for non creamy layer certificate in Kerala?
เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเตผ เดฎเตเตปเดชเดพเดเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเตเดเดฟเตฝ เดเดจเตเดจ เดตเดพเตผเดกเดฟเตฝ เดเดจเตเดจ เดตเตเดเตเดเดฟเตฝ เดคเดพเดฎเดธเดฟเดเตเดเตเดจเตเดจ เดเดจเตเดจเดฏเดพเดณเตเดเต เดฎเดเตป เดเดฏ เดเดพเตป เดฌเตเดงเดฟเดชเตเดชเดฟเดเตเดเตเดจเตเดจ เดธเดคเตเดฏเดตเดพเดเตเดฎเตเดฒเด เดเดพเตป เดฎเตเตฝเดเดพเดฃเตเดจเตเดจ เด เดกเตเดฐเดธเดฟเตฝ เดเดคเตเดฐ ...
1 299 6092 -
Niyas Maskan
Village Officer, Kerala . Answered on March 10,2022เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเต เดธเดฎเดฏเด เดเดคเตเดฐเดตเดฐเต ? เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดดเตเดคเดพเตป เดชเตเดฐเดคเตเดฏเตเดเด เดธเดฎเดฏเด เดเดฃเตเดเต ?
เดฐเดพเดตเดฟเดฒเต 10 เดฎเดฃเดฟ เดฎเตเดคเตฝ เดตเตเดเตเดจเตเดจเตเดฐเด 5 เดฎเดฃเดฟเดตเดฐเต, เดเดเตเดเดฏเตเดเตเดเต Lunch time
1 0 2160 -
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on June 25,2021NPS,NPNS, NPI, PHH,AAY เดเดจเตเดคเดพเดฃเต?
NPS - Non Priority Subsidy,NPNS - Non Priority Non Subsidy,NPI - Non Priority Institution,PHH - Priority House Hold,AAY - ...
2 0 18914 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 5626 -
Kerala Institute of Local Administration - KILA
Government of Kerala . Answered on September 21,2021เดเดฆเตเดฏ เดตเดฟเดตเดพเดน เดฌเดจเตเดงเด เดตเตเตผเดชเตเดเตเดคเตเดคเดพเดคเต เดฎเดฑเตเดฑเตเดฐเต เดตเดฟเดตเดพเดนเด เดเดดเดฟเดเตเดเดพเตฝ เด เดคเต เดตเดพเดฒเดฟเดกเดฟเดฑเตเดฑเดฟ เดเดเตเดฎเต เด เดคเต เดเดเตเดเดจเต เด เดฑเดฟเดฏเดพเด?
1937 เดฒเต เดฎเตเดธเตเดฒเดฟเด เดชเตเตผเดธเดฃเตฝ เดฒเดพ (เดถเดฐเตเด เดคเตเดคเต) เดเดชเตเดฒเดฟเดเตเดเตเดทเตป เดจเดฟเดฏเดฎเด เด เดจเตเดธเดฐเดฟเดเตเดเตเดณเตเดณ เดตเดฟเดตเดพเดนเดเตเดเดณเดฟเตฝ เดชเตเดฐเตเดทเดจเต เดธเดเดฌเดจเตเดงเดฟเดเตเดเต เดเดฆเตเดฏเดญเดพเดฐเตเดฏเดฏเตเดฎเดพเดฏเตเดณเตเดณ เดฌเดจเตเดงเด เดจเดฟเดฒเดจเดฟเตผเดคเตเดคเดฟเดเตเดเตเดฃเตเดเตเดคเดจเตเดจเต เดฐเดฃเตเดเดพเดฎเดคเต เดเดฐเต เดญเดพเดฐเตเดฏเดฏเต เดเตเดเดฟ ...
1 0 915 -
Niyas Maskan
Village Officer, Kerala . Answered on February 10,2023I need Caste Certificate in Kerala. But I and my parents don't have SSLC certificate which is normally used for supporting caste certificate. How I can apply for caste certificate and what other documents could be used to support my application?
SSLC เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดชเตเดฒเดฟเดเตเดเดจเตเดฑเดฟเดจเต เดชเตเดฐเตเดจเตเดฑเตเดธเดฟเดจเต เดเดฒเตเดฒเตเดเตเดเดฟเตฝ เดเดชเตเดฒเดฟเดเดจเตเดคเต เดชเตเดฐเตเดจเตเดคเต เดธเตเดเตเดณเดฟเตฝ เดชเด เดฟเดเตเดเดฟเดฐเตเดจเตเดจ เดเดพเดฒเดคเตเดคเต เดธเตเดเตเตพ เด เดกเตเดฎเดฟเดทเตป เดฑเดเดฟเดธเตเดฑเตเดฑเดฑเดฟเดจเตเดฑเต extract เดฒเดญเดฟเดเตเดเตเดจเตเดจเดคเดพเดเตเด. เด เดคเดฟเตฝ เด เดตเดฟเดฆเตเดฏเดพเตผเดคเตเดฅเดฟเดฏเตเดเตเดเตเดฑเดฟเดเตเดเต เดเดฒเตเดฒเดพ เดตเดฟเดตเดฐเดเตเดเดณเตเด ...
1 44 866