Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
Suppose I have set up a plant with a 40% subsidy scheme with 3 kWp capacity as part of the KSEB Soura scheme. If I have excess electricity after my consumption, can this be adjusted against my bill via net metering?
Nandakumar N, Assistant Engineer, Soura Project, KSEB
Answered on March 05,2020
Answered on March 05,2020
In model 2, every year amount will be adjusted on September 30. If there is an export of electricity, the amount will be paid in cash.
KSFE
Sponsored
KSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What is the minimum space required to install a solar rooftop project as part of the KSEB Soura scheme?
For installing a minimum solar plant capacity of 2 kWp, 200 sq.ft. is required.
1 38 714 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can the solar panel be installed in the house where the tress work is done as part of the KSEB Soura scheme?
It can be done in Model 2,at the customer's expense,with 40% subsidy. Model II of KSEB SOURA Subsidy scheme Consumer owns ...
1 57 1088 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเต เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเตฝ 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020If my house needs to be renovated, will KSEB replace the Soura solar panel free of cost?
You have to pay the labour charge for replacing the Soura solar panel.
1 13 200 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020What will be the cost of Solar power plant with 3 kW capacity, if applied on a 40% scheme as part of the KSEB Soura scheme?
It will cost you Rs 1,62,000. If you opt for Model 2, you get 40% of it as the subsidy.So you need to pay ...
1 89 1423 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020In the KSEB Soura scheme, does the electricity generated is taken to the grid or do we need to have battery to store the power?
In Off-Grid, you have the need for a battery. But KSEB's projects are On-Grid and in it, there is no ...
1 42 785 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดชเตเดฐเตเดฎเดฟเดฏเด เดเตเตพเดกเต เดฒเตเตบ
เดธเตเดตเตผเดฃเตเดฃเดตเดฟเดฒเดฏเตเดเต 85% เดตเดฐเต เดตเดพเดฏเตเดช...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Is the amount paid for the KSEB Soura scheme refundable?
The amount paid for KSEB Soura scheme is refundable, provided that KSEB find it technically not feasible to set up ...
1 40 758 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Who will do the maintenance for the KSEB Soura scheme?
KSEB will do the maintenance through an empanelled service provider. KSEB will provide a list of empanelled service providers. ...
1 19 369 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Should I apply for Model 1 or 2 of KSEB Soura Scheme?
You can register for any of the models now. After inspection, based on technical feasibility, you have the option ...
1 22 439 -
KSFE
Sponsoredเดชเตเดฐเดตเดพเดธเดฟ เดฎเดฒเดฏเดพเดณเดฟเดเตพเดเตเดเดพเดฏเดฟ KSFE Duo
เดเดฟเดเตเดเดฟ + เดจเดฟเดเตเดทเตเดชเด = เดเดฐเดเตเดเดฟ เดจเตเดเตเดเด.
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020How much will be the cost for 2 kWp installation for KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 30 600 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020I have 1000 sqft rooftop. How many kw of solar panel can I install as part of KSEB Soura scheme?
1 kw requires 100 sqft. So you can install 10kw of solar panel on 1000 sqft rooftop. With 10 ...
1 65 1252 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Will KSEB provides money to excess electricity in Model 2 of Soura scheme?
Yes, KSEB will provide money to excess electricity in Model 2 by the month of September every year.
1 13 202 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020For 3KW plant, how much is the cost in KSEB Soura scheme?
As per the Ministry of New and Renewable Energy (MNRE) issued guidelines, the maximum amount the empanelled service providers ...
1 40 759 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 05,2020Can I apply for KSEB Soura Scheme when the construction of my house is going on?
If you are planning to finish construction in 6 months' time, you can apply for it. If it is ...
1 9 134 -
Try to help us answer..
-
How can i cancel my registration roof top solar scheme under e kiran?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
How can i cancel my registration roof top solar scheme under e kiran?
-
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 89779 -
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 3183 66223 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 413 8234 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 6596 -
KSFE
Government of Kerala . Answered on March 31,202110 lakh ksfe chitty , 5 % commission is 50000, 12% GST and 1 % cess. that's in a total deducted amount is 56500 . Our hand 943500 lakh. Is it correct?
It is correct. The subscriber should also remit an amount of Rs.200/- as documentation charge, otherwise this amount also ...
1 0 6714 -
Niyas Maskan
Village Officer, Kerala . Answered on March 10,2022เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเต เดธเดฎเดฏเด เดเดคเตเดฐเดตเดฐเต ? เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดเดดเตเดคเดพเตป เดชเตเดฐเดคเตเดฏเตเดเด เดธเดฎเดฏเด เดเดฃเตเดเต ?
เดฐเดพเดตเดฟเดฒเต 10 เดฎเดฃเดฟ เดฎเตเดคเตฝ เดตเตเดเตเดจเตเดจเตเดฐเด 5 เดฎเดฃเดฟเดตเดฐเต, เดเดเตเดเดฏเตเดเตเดเต Lunch time
1 0 2351 -
Balachandran Kollam
Answered on August 19,2023เดเตเดเตเดเดฟเด เดจเดฟเดเตเดคเดฟ receipt เดจเดทเตเดเดชเตเดชเตเดเตเดเต online เดเดฏเดฟ เดเดเตเดเดจเต เดเดเตเดเตเดเดพเตป เดธเดพเดฆเดฟเดเตเดเตเด?
เดเตบเดฒเตเดจเดพเดฏเดพเดฃเต เด เดเดเตเดเดคเตเดเตเดเดฟเตฝ เดตเดฟเดถเดฆเดตเดฟเดตเดฐเดเตเดเตพ เดธเดนเดฟเดคเด เดตเดฟเดฒเตเดฒเตเดเต เดเตเดตเดจเดเตเดเดพเดฐเต เดธเดฎเตเดชเดฟเดเตเดเตเด. เด เดตเตผ เดฐเดธเตเดคเดฟเดจเตเดฑเต เดชเดเตผเดชเตเดชเต เดเดเตเดคเตเดคเต เดจเตฝเดเตเด.
1 0 464 -
Issac Joy
Answered on April 21,2023What is the relation between cent and Are in land measurement?
เดตเตเดเดฟเดจเตเดเตเดเตเดฑเดฟเดเตเดเตเด เดตเดธเตเดคเตเดตเดฟเดจเตเดเตเดเตเดฑเดฟเดเตเดเตเดฎเตเดฒเตเดฒเดพเด เดธเดเดธเดพเดฐเดฟเดเตเดเตเดฎเตเดชเตเดพเดณเต เดจเดพเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ เดเดชเดฏเตเดพเดเดฟเดเตเดเตเดจเตเดจ เดเดเดเดฎเดพเดฃเต เดธเตเดจเตเดฑเต, เดเดฐเต เดเดจเตเดจเดฟเดต. เดเดจเตเดจเดพเดฒเต เดเดฐเต เดธเตเดจเตเดฑเต/เดเดฐเต เดเดคเตเดฐเดฏเดพเดฃเตเดจเตเดจเต เดเดคเตเดฐเดชเตเดฐเตเดเตเดเดฑเดฟเดฏเดพเด. เด เดณเดตเตเดเดพเดฐเดจเตเด เดเดจเตเดเดฟเดจเตเดฏเดฐเตเดเตเดเตเด เดฎเดฑเตเดฑเต เดตเดฟเดฆเดเตเดงเดฐเตเดเตเดเตเด ...
1 0 1568 -
Consumer Complaints & Protection
Regd. Organization for Consumer Rights . Answered on August 12,2020เดเดจเตเดคเดพเดฃเต เดเดดเดฟเดฎเตเดฑเดฟ?
เดตเดธเตเดคเต เดชเดฃเดฏเดชเตเดชเตเดเตเดคเตเดคเดฟ เดฌเดพเดเตเดเตเดเดณเดฟเตฝ เดจเดฟเดจเตเดจเตเด เดฒเตเตบ เดเดเตเดเตเดเตเดฎเตเดชเตเตพ เดฐเดฃเตเดเตเดคเดฐเดคเตเดคเดฟเดฒเตเดณเตเดณ เดชเดฃเดฏเดชเตเดชเตเดเตเดคเตเดคเดฒเดพเดฃเต เดเดฃเตเดเดพเดตเดพเดฑเตเดณเตเดณเดคเต. 1) Equitable Mortgage 2) Registered Mortgage Nationalized Shedule เดฌเดพเดเตเดเตเดเตพ เดธเดพเดงเดพเดฐเดฃเดฏเดพเดฏเดฟ Equitable Mortgage เดเดฃเต ...
2 0 6700 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on July 07,2020เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด / เดจเดฟเดเตเดคเดฟ เดเตบเดฒเตเดจเดพเดฏเดฟ เดเดเตเดเดจเต เด เดเดฏเตเดเตเดเดพเด?
เดเตเดฐเดณเดคเตเดคเดฟเตฝ เดญเตเดฎเดฟเดฏเตเดเต เดเดฐเด เดเตบเดฒเตเดจเดพเดฏเดฟ เด เดเดฏเตเดเตเดเตเดจเตเดจเดคเดฟเดจเต, เดคเดฃเตเดเดชเตเดชเตผ เดเดตเดถเตเดฏเดฎเดพเดฃเต. เดเดฎเตเดชเตเดฏเตเดเตเดเตผ เดเดจเดฑเตเดฑเตเดฑเตเดเตเดฏเตเดค เดจเดฎเตเดชเดฑเดพเดฃเต เดคเดฃเตเดเดชเตเดชเตผ. เดคเดฃเตเดเดชเตเดชเตผ เดฒเดญเดฟเดเตเดเดพเตป, เดเดจเดฟเดชเตเดชเดฑเดฏเตเดจเตเดจ เดฐเตเดเดเดณเตเดฎเดพเดฏเดฟ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเต เดธเดจเตเดฆเตผเดถเดฟเดเตเดเตเด. เดญเตเดฎเดฟเดฏเตเดฎเดพเดฏเดฟ เดฌเดจเตเดงเดชเตเดชเตเดเตเด เดฐเตเดเดเตพ เดเดดเดฟเดเตเด เดตเตผเดทเดคเตเดคเต ...
1 0 22498