The price mentioned for 3kW solar installation under model 2 of kseb soura is 75,596/- in website, would like to know what all are covered in above mentioned price, like net-meter,surge protection, lightning arrester installation are covered ?
The price mentioned for 3kW solar installation under model 2 of kseb soura is 75,596/- in website, would like to know what all are covered in above mentioned price, like net-meter,surge protection, lightning arrester installation are covered ?
Kerala State Electricity Board, Government of Kerala
Answered on March 19,2021
Answered on March 19,2021
It is all inclusive cost.
KSFE
Sponsored
KSFE เดเดพเดฒเดเตเดธเดฟ เดเดฟเดเตเดเดฟเดเตพ
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
เดธเตเดธเตเดฅเดฟเดฐเดฎเดพเดฏ เดธเดฎเตเดชเดพเดฆเตเดฏเด, เดตเดพเดจเตเดณเดฎเตเดฏเดฐเตเดจเตเดจ เดธเดฎเตเดฆเตเดงเดฟ!!! 2024 April 1 เดฎเตเดคเดฒเตโ 2025 February 28 เดตเดฐเต
Related Questions
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Is it possible for the customer to select the unit and company for solar panel installation in model 2 of the KSEB Soura scheme?
Customers can choose the company for solar panel installation in model 2 of the KSEB Soura scheme.
1 10 111 -
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on March 08,2020Can homes with asbestos apply for model 2 of KSEB soura scheme?
You can apply for it, but you will need to create the structure to support solar panels.
1 8 61 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดญเดตเดจ เดตเดพเดฏเตเดช
30 เดตเตผเดทเด เดตเดฐเต เดคเดฟเดฐเดฟเดเตเดเดเดตเต เดเดพเดฒเดพเดตเดงเดฟเดฏเดฟเตฝ 1 เดเตเดเดฟ เดฐเตเดช เดตเดฐเต...
-
Nandakumar N
Assistant Engineer, Soura Project, KSEB . Answered on June 05,2020Regarding KSEB soura scheme, Can we use battery to save solar energy and use it while there is no electricity from kseb?
เดฌเดพเดฑเตเดฑเดฑเดฟ เดธเตเดฑเตเดฑเตเดฑเตเดเต เดธเตเดฐ เดชเดฆเตเดงเดคเดฟเดฏเดฟเตฝ เดเตพเดชเตเดชเตเดเตเดเดฟเดเตเดเดฟเดฒเตเดฒ. เดเดจเตเดจเดพเตฝ เดฒเตเดกเดฟเตปเตเดฑเต เดญเดพเดเดฎเดพเดฏเดฟ เดฌเดพเดฑเตเดฑเดฑเดฟ เดธเตเดฑเตเดฑเตเดฑเตเดเต เดเตปเดตเตผเดเตเดเดฑเตเดเตพ เดเดชเดญเตเดเตเดคเดพเดตเดฟเดจเต เดธเตเดตเดจเตเดคเด เดจเดฟเดฒเดฏเดฟเตฝ เดตเดฏเตเดเตเดเดพเดตเตเดจเตเดจเดคเดพเดฃเต.
2 10 609 -
Kerala State Electricity Board
Government of Kerala . Answered on June 09,2020Regarding KSEB soura scheme, Can we use battery to save solar energy and use it while there is no electricity from kseb?
Inverter can be used.Not solar inverter
2 8 570 -
Kerala State Electricity Board
Government of Kerala . Answered on June 22,2020It is seen that consumers having monthly average consumption above 200 units are not eligible for the Saura Subsidy scheme. Is it correct? Is there any stipulation like that?
Consumers having monthly average consumption above 200 units can register in Model 2.
2 0 49 -
KSFE
Sponsoredเดเต.เดเดธเต.เดเดซเต.เด เดชเตเดฐเตเดฎเดฟเดฏเด เดเตเตพเดกเต เดฒเตเตบ
เดธเตเดตเตผเดฃเตเดฃเดตเดฟเดฒเดฏเตเดเต 85% เดตเดฐเต เดตเดพเดฏเตเดช...
-
Kerala State Electricity Board
Government of Kerala . Answered on October 14,2020I have applied for KSEB Soura model 2 subsidy. Will the solar plant/residential be installed by KSEB Kerala or can I ask Tata solar to do it for me and get 40% subsidy ?
You will get subsidy from KSEB provided you choose any of the empanelled service providers of KSEB.
1 41 1004 -
Kerala State Electricity Board
Government of Kerala . Answered on December 16,2020Will my tariff rate change from the current LT-1(Domestic) category to any other category after I install a 2KW solar plant under Scheme-II of the Soura Scheme or will the same rates be applicable for any additional consumption over and above the installed capacity of the plant?
The consumer will be billed for net import only. (Import - export)
1 0 40 -
Kerala State Electricity Board
Government of Kerala . Answered on April 07,2021Regarding soura project , is the solar inverter that will be used pure sine wave , square wave or modified sine wave ?
There is no solar inverter. Soura subsidy scheme is an ongrid program. Since it is always connected to grid, ...
1 0 57 -
KSFE
Sponsoredเดชเตเดฐเดตเดพเดธเดฟ เดฎเดฒเดฏเดพเดณเดฟเดเตพเดเตเดเดพเดฏเดฟ KSFE Duo
เดเดฟเดเตเดเดฟ + เดจเดฟเดเตเดทเตเดชเด = เดเดฐเดเตเดเดฟ เดจเตเดเตเดเด.
-
Kerala State Electricity Board
Government of Kerala . Answered on December 28,2020I have applied for 3kw solar plant under Model II. I have the following doubts (1) If I want to add 2 or 3 points after installation of the plant, whether I should obtain prior permission from kseb. (2) After installation of the plant, if Iam away from house for a period of , say 2 or 3 months, wherther I will get monthly bill for the period, or whether the bill be adjusted against the power generated by the plant. Whether monthly I will have to pay the meter charge.
1) Additional connected load may be informed to KSEB whether the consumer is solar or not. Prior permission is ...
1 0 118 -
Kerala State Electricity Board
Government of Kerala . Answered on December 28,2020I have applied for 3kw under Model II. As per the list of cost available on the website the total cost is shown as Rs75596/-. Below the table Model II, there is another table showing the cost per kw . In that table, the cost per kw for 3 kw plant is Rs.41998/-. after deduction of 40% the cost will be Rs.94500/- Why this difference? Any mistake? If so please make the required correction in the list of cost.
For 3kW in model 2, consumer has to pay Rs75596/-. No other charges
1 0 54 -
KSFE
SponsoredKSFE เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024
เดเดจเตเดฎเดฆเดฟเดจเดพเดเตเดทเดเตเดเดณเตเดเต เดญเดพเดเดฎเดพเดฏเดฟ เดเต.เดเดธเต.เดเดซเต.เด.เดฏเตเดเต เดเดฒเตเดฒเดพ เดถเดพเดเดเดณเดฟเดฒเตเด เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024 เดจเดเดคเตเดคเตเดจเตเดจเดคเดพเดฃเต
-
Kerala State Electricity Board
Government of Kerala . Answered on December 28,2020I opted for model 2 installation with 2kw now only vendor selection is over. Can I upgrade to 3kw? How long will it take to get the subsidy from KSEB after installation? If the vendor doesn't have the required panel of my choice eg:375 watt mono crystalline,what is the solution?
You can upgrade to 3kW at the time of site inspectionYou have to remit the subsidised amount only.Mono crystalline ...
1 8 141 -
Kerala State Electricity Board
Government of Kerala . Answered on December 31,2020Considering high efficency in production even in low light, will customer can choose for mono panel over poly panel for Soura Subsidy scheme? Is this choice available? Atleast for model 2 where customer bare the cost?
Mono crystalline panels are not available now. It may / may not be there in future tenders. We don't ...
1 0 142 -
KSFE
SponsoredKSFE เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024
เดเดจเตเดฎเดฆเดฟเดจเดพเดเตเดทเดเตเดเดณเตเดเต เดญเดพเดเดฎเดพเดฏเดฟ เดเต.เดเดธเต.เดเดซเต.เด.เดฏเตเดเต เดเดฒเตเดฒเดพ เดถเดพเดเดเดณเดฟเดฒเตเด เดเดธเตเดฑเตเดฑเดฎเตผ เดฎเตเดฑเตเดฑเต 2024 เดจเดเดคเตเดคเตเดจเตเดจเดคเดพเดฃเต
-
Kerala State Electricity Board
Government of Kerala . Answered on February 01,2021I have applied for the KSEB Soura model 1c on 25th January 2021. I can see on the website that the option select the developer for phase 2 has ended on 12th January 2021. When will the option to select the developer reopens again?
The next phase of developer selection will be during March April 2021
1 0 27 -
Try to help us answer..
-
How can i cancel my registration roof top solar scheme under e kiran?
Write Answer
-
I'm planning to upgrade my ongrid rooftop solar from 3 kw to 5 kw as part of KSEB Soura scheme. Will I have to buy a new 5 kw dc ac inverter. Or Can I buy a new 2 kw inverter and install this inverter additionally Or Will I need to buy a new 5kw inverter
Write Answer
-
I have installed KSEB solar power plant in my house. Suppose the plant made 400 units and I have used 500 units a month. So should I pay the electricity bill for 100 units or will it be adjusted from the previous month's excess unit reserve?
Write Answer
-
How much time it would take in Kerala for getting metre changed by KSEB for on grid Solar connection after submitting papers after installation?
Write Answer
-
Kerala State Electricity Board-Soura (Solar project)-Subsidy scheme 1C with an agreement that excess unit produced from the rooftop would be taken by KSEB through on-grid system and will be paid back. But more than an year passed no payment received. What to do?
Write Answer
-
How can i cancel my registration roof top solar scheme under e kiran?
-
Trending Questions
-
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023Where are the AI Camera locations of motor vehicle department in Kerala?
*All Kerala MVD AI camera locations* Thiruvananthapuram Parassala Thiruvananthapuram Pambukala Thiruvananthapuram Kovalam Jn Thiruvananthapuram Neyyattinkara_2 Thiruvananthapuram Neyyattinkara_1 Thiruvananthapuram Thozhukkal Thiruvananthapuram Balaramapuram_1 Thiruvananthapuram Balaramapuram_2 Thiruvananthapuram Pallichal Jn Thiruvananthapuram Thiruvallom Thiruvananthapuram Kumarichantha Thiruvananthapuram ...
1 0 88536 -
JOY MRC
Answered on September 19,2021How to convert license number 5/9308/2014 from Kerala to this new format in Digilocker?
Use mparivahan app for RC and License addition which is equivalent to digilocker and also valid for Rto checking. ...
2 3151 65599 -
Subhash Chandran
Retired Dy Tahsildar and Land Consultant, Mobile- 8848753166 . Answered on September 07,2023เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดจเตเดคเดพเดฃเต?
Settlement เดเดพเดฒเดคเตเดคเต เดฎเดฒเดฌเดพเตผ เดชเตเดฐเดฆเตเดถเดคเตเดคเตเดณเตเดณ เดญเตเดฎเดฟเดเดณเต เดจเดเตเด, เดคเตเดชเต, เดธเตเดฅเดฟเดฐเด เดชเตเดเตเด,เด เดธเตเดฅเดฟเดฐเดค เดชเตเดเตเด, เดจเดฟเดเตเดคเดฟเดเตเดเตเดเดพเดคเดคเต, เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดเดจเตเดจเดฟเดเตเดเดจเต เดเดฑเดพเดฏเดฟ เดคเดฟเดฐเดฟเดเตเดเดฟเดฐเตเดจเตเดจเต…เดธเตเดฅเดฟเดฐเดชเตเดเตเด เดเดจเตเดจเดพเตฝ เดเดฒเตเดฒเดพ เดตเตผเดทเดตเตเด เดธเตเดฅเดฟเดฐเดฎเดพเดฏเดฟ ...
1 0 6033 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023What is the procedure for tharam matom - land conversion nilam to purayidom in Kerala ?
Nilam - purayidom Land conversion or Tharam mattom in Kerala The register containing details of all types of land ( ...
1 86 7815 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on April 14,2023เดเดจเตเดคเดพเดฃเต เดตเดฟเดฒเตเดฒเตเดเต เดเดซเตเดธเดฟเดฒเต BTR เด เดฅเดตเดพ เดฌเตเดธเดฟเดเต เดเดพเดเตเดธเต เดฐเดเดฟเดธเตเดฑเตเดฑเตผ . เดชเตเดฐเดพเดงเดพเดจเตเดฏเดฎเตเดจเตเดคเต?
เดเดฐเต เดตเดฟเดฒเตเดฒเตเดเดฟเดฒเตเดณเตเดณ เดเดฒเตเดฒเดพ เดญเตเดฎเดฟเดเดณเตเดเตเดฏเตเด เดธเตผเดเตเดเดพเตผ เดญเตเดฎเดฟเดฏเดพเดฏเดพเดฒเตเด เดชเตเดฑเดฎเตเดชเตเดเตเดเต เดญเตเดฎเดฟ เดเดฏเดพเดฒเตเด เดธเตผเดตเตเดตเต เดจเดฎเตเดชเตผ เดเตเดฐเดฎเดคเตเดคเดฟเดฒเตเดณเตเดณ เดตเดฟเดตเดฐเดเตเดเตพ เดเดพเดฃเดฟเดเตเดเตเดจเตเดจ เดธเตเดฅเดฟเดฐเด เดฐเดเดฟเดธเตเดฑเตเดฑเตผ เดเดฃเต เด เดเดฟเดธเตเดฅเดพเดจ เดญเตเดฎเดฟ ...
1 393 7830 -
James Joseph Adhikarathil
Former Deputy Collector, Alappuzha,Leading Land Consultant in Kerala. Call 9447464502 . Answered on March 07,2023How pokkuvaravu, mutation of land is done in Kerala?
The following article will help you to understand the land tax payment procedure in Kerala. เดญเตเดฎเดฟเดฏเตเดเต เดชเตเดเตเดเตเดตเดฐเดตเตเด เดเดฐเดฎเดเดฏเตเดเตเดเดฒเตเด . เดเตเดฐเดณ เดญเตเดจเดฟเดเตเดคเดฟ ...
1 0 111 -
Niyas Maskan
Village Officer, Kerala . Answered on July 30,2020How long is one and same certificate valid? Who will issue it if i have to produce before the American consulate? Is it valid for use if my name is different in land related documents?
One and the Same certificate has lifetime validity now.If the certificate is to be submitted to any institution within ...
1 0 4950 -
Balachandran Kollam
Answered on August 19,2023เดเดจเตเดคเดพเดฃเต Posession, non LA and non RR?
A certificate of possession is a certificate that certifies who possesses the registered lands. Revenue authorities are also granting ...
1 0 1291 -
Venu Mohan
Citizen Volunteer, Kerala . Answered on April 15,2021BPL เดธเตผเดเตเดเดฟเดซเดฟเดเตเดเดฑเตเดฑเต เดจเตฝเดเตเดจเตเดจเดคเต เดธเดเดฌเดจเตเดงเดฟเดเตเดเต เดธเตผเดเตเดเดพเตผ เดเดคเตเดคเดฐเดตเดฟเดจเตเดฑเต -(เดเต )เดจเดฎเตเดชเตผ 2867/16เดคเดฟเดฏเดคเดฟ 13.10.2016-เดชเดเตผเดชเตเดชเต เดเดฃเตเดเดพเดเตเดฎเต ?
Please see the Government Order below.
1 0 638 -
Niyas Maskan
Village Officer, Kerala . Answered on August 31,2023What is the format affidavit for non creamy layer certificate in Kerala?
เด เดซเดฟเดกเดตเดฟเดฑเตเดฑเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเดเต เดเดซเตเดธเตผ เดฎเตเตปเดชเดพเดเต เดเดจเตเดจ เดตเดฟเดฒเตเดฒเตเดเดฟเตฝ เดเดจเตเดจ เดตเดพเตผเดกเดฟเตฝ เดเดจเตเดจ เดตเตเดเตเดเดฟเตฝ เดคเดพเดฎเดธเดฟเดเตเดเตเดจเตเดจ เดเดจเตเดจเดฏเดพเดณเตเดเต เดฎเดเตป เดเดฏ เดเดพเตป เดฌเตเดงเดฟเดชเตเดชเดฟเดเตเดเตเดจเตเดจ เดธเดคเตเดฏเดตเดพเดเตเดฎเตเดฒเด เดเดพเตป เดฎเตเตฝเดเดพเดฃเตเดจเตเดจ เด เดกเตเดฐเดธเดฟเตฝ เดเดคเตเดฐ ...
1 307 6259